There are several bases for block parquet. But we will consider only one. This option is the easiest to install on your own. In order to start laying parquet, it is worth making sure that the irregularity error does not exceed 1 mm per 2 m2. If the error is greater, after installation, you will see obvious unevenness in the floor. And it will also significantly complicate the installation work on laying the parquet. After this, you need to thoroughly remove the dust and fill the floor with a primer. With the help of auxiliary objects, the primer should be evenly distributed over the entire floor of the room and allowed to dry. When the primer is dry, dilute the parquet adhesive and apply a little on the floor. Places already greased with glue should be immediately covered with parquet.
Have you wanted to change your old bedding for a long time, but do not know where to buy cheaper? We advise you to visit our website and purchase bed linen from us for your home at a low price. Also on our website you will find a lot of useful information.
Remember that there should be a gap of about 1 — 1.5 cm between the parquet boards and the wall. This gap is necessary due to the expansion and contraction of the wood. This is due to temperature changes and changes in the level of humidity in the room. If you do not leave a gap, the parquet will begin to bulge.
Once the entire floor has been laid, you can start installing the skirting boards. As a rule, in the case of parquet, the skirting profile should only be fixed to the walls..
After the completion of all work, the load should be laid on the parquet. This will provide better adhesion to the substrate. The load must lie until the glue is completely dry.